history of breaks
Restoration Costs to Date
In Summary
Site Photos
Kitec Pipe - Interior Failing
Kitec Pipe Generally fails from the inside out
Signs of failing pipe: Discoloration, bubbling, grey spots, fractures in outrer layer
In Suite Repairs
Kitec Pipe location/installation difficulty to repair using conventional repiping methods
Utilizing the “Plumbing Track” system, we reduce the amount of ceiling and wall damages by up to 80%
Introduction to Kitec
Kitec is a brand of plumbing system components, including pipes and fittings, widely used in North America from 1995 to 2007
Class Action Lawsuits
Kitec is a brand of plumbing system components, including pipes and fittings, widely used in North America from 1995 to 2007
Current Status
Kitec is a brand of plumbing system components, including pipes and fittings, widely used in North America from 1995 to 2007
Scope of Work
Communication
[COMMUNICATION INFORMATION]
Construction
[CONSTRUCTION INFORMATION]
Methodology
[METHODOLOGY INFORMATION]
Some of Our Completed Projects
THE LEGACY
KITEC REPIPING
COMPLETED
KELVIN COURT
POLY-B REPIPING
COMPLETED
THE BENCH
KITEC REPIPING
COMPLETED
wildwood iii
KITEC REPIPING
COMPLETED
BRANDTS CROSSING
KITEC REPIPING
COMPLETED
THE BENCH
KITEC REPIPING
COMPLETED
wildwood ii
KITEC REPIPING
COMPLETED
AWARDED $250,000
KITEC CLASS ACTION LAWSUIT
WILSON COURT
POLY-B REPIPING
COMPLETED
SAMPLES fROM Completed Projects
oUR cASE sTUDY
4 Storey Multifamily Repipe project - Outside Corner Suite
When repiping a large mulifamily building, the outside corner units (2 bedroom, 2 bathrooms) are considered the most difficult. Due to the larger size, kitchens are usually more central inside the units and two beds/baths are generally on opposite sides of the unit.
Conventional Construction Methods
Current construction methodology would be to cut open the walls and ceilings to access the old pipe and install the new piping within the same chase/cavities.
Large scale drywall and carpentry repairs would be required to complete this “Outside corner Unit”
Plumbing Track Solution
In 2024, Building: Brandt’s Crossing, 42 Units - 4 stories, we completed a full repipe, including independent shut off valves with “ZERO” drywall repairs inside the suite utilizing the renowned “Plumbing Track” system solution.
Proof of concept complete.